Plumely

All tools

Supplier & CoA Qualification

Verify every incoming batch has an in-spec, non-expired CoA from a qualified supplier before it reaches your line.

The problem it solves

Incoming raw-material CoAs get filed the moment they arrive and rarely get checked again — so an out-of-spec result, an expired supplier qualification, or a lapsed certificate only surfaces after a batch has already gone into production. Nothing owns that check as a discrete step before release.

How it works

  1. 1Qualify a supplier once, with its own qualification record and review workflow.
  2. 2Attach each raw material to a qualified supplier and its accepted spec range.
  3. 3Log each incoming CoA against that material and supplier — in spec or not.
  4. 4Run a batch-readiness check that surfaces whether every material behind a batch has a current, in-spec, qualified CoA before it's signed off.

Who it’s for

QA managers and supplier quality leads at API and formulation manufacturers.

Does this replace our incoming QC testing?

No — it doesn't run lab tests. It tracks the paperwork and qualification status around a result you already have, so a batch can't move forward on an expired certificate or an unqualified supplier without someone seeing that first.

Related tools

Learn the terms